PRODUCTIVITY OF CONSTRUCTION PROJECT FROM CONTRACTOR POINT OF VIEW
DOI:
https://doi.org/10.29121/ijetmr.v5.i12.2018.334Keywords:
Contractor, Productivity, Completion Time, Construction ProjectAbstract
Construction project is a continuous activity that link to one another. If there is a delay in one activity it can make delay to the other activity. One of the factors that affect the project completion time is the productivity of each activity. Research of Contractor point of view on the productivity of construction project is expected to give more actual description of Contractor point of view on work productivity and identifying factors that strongly affect productivity so that it can be used as guidance to take steps to improve productivity in construction project. The method that this research use is questionnaire distribution. This method is chosen because it makes easier for researcher to collect data, saving time, and shorten research time. The research result shows that according to contractor, productivity needs to be increase so that construction project quality also improve. According to contractor poit of view, technology can be used as a solution to increase productivity in construction project.
Downloads
References
Ambar, T. S., Rosidah. Manajemen Sumber Daya Manusia. Graha Ilmu. Yogyakarta. 2009
Bogdan, R., Talyor, J. Introduction to qualitative research methods : a phenomenological approach to the social science. New York: Willey-interscience publication. 1992
Creswell,J. Research design : qualitative and quantitative approaches. Singap ore:Sage production. 2014
Danang, S. Teori, Kuesioner, dan Analisis Data Sumber Daya Manusia (Praktik Penelitian), Yogyakarta. CAPS
Dwi, T., Sri Murni, D., Sugeng, P.B. Faktor-faktor yang Mempengaruhi Produktivitas Pekerja Pada Pekerjaan Atap Baja Ringan di Perumahan Green Hills Malang. Jurnal Rekayasa Sipil, Vol 6, No.1, 2012
Hamdan, D., Kadar, N. Manajemen Proyek. Pustaka Setia. Bandung, 2014
Idzuraida, I. Keterlambatan Proyek Konstruksi Gedung, Faktor Penyebab dan Tindakan Pencegahannya, Jurnal Momentum, Vol.14 (1), Feb, 2013.
Ilyas, Yaslis. Kinerja Teori Penilaian dan Penelitian. Fekom UI, Jakarta. 1999
Issac, A., O., Godwin, I., I. Influence of Labour-Related Factors on Construction Labour Productivity in The South-South Geo-Political Zone of Nigeria. Journal of Construction in Developing Countries, 19(1), pp 93-109, 2014
Jan, T, Pingkan A.K. P, Walangitan, D.R.O. Analisis Tenaga Kerja Terhadap Produktivitas Pada Proyek Konstruksi (Studi Kasus: Rehabilitasi dan perluasan Rumah Dinas Rektor Unsrat), Tekno, Vol. 14, No. 65. April, 2016
Mahamid, I. Contractors Perspective Toward Factors Affecting Labor Productivity in Building Construction. Engineering, Construction and Architectural Management, Vol 20, Issue 5, pp 446- 460, 2013 DOI: https://doi.org/10.1108/ECAM-08-2011-0074
Mohammed, A.H., Montaser A. H., Ghaleb, J.S. Factors Affecting Construction Labour Productivity: A Case Reseach of Jordan. International Journal of Construction Management, Vol. 16, Issue 2, pp 138-149, 2016 DOI: https://doi.org/10.1080/15623599.2016.1142266
Moselhi, O., Khan, Z. Analysis of Labour Productivity of Formwork Operations in Building Construction. Construction Innovation, 2010. 10(3), 286-303 DOI: https://doi.org/10.1108/14714171011060088
Muchdarsyah, S. Produktivitas, Apa dan bagaimana. Bumi Aksara. Jakarta. 1997 Nasution, Leni Masnidar. Statistik Deskriptif. Jurnal Hikmah, 2017. 14 (1), 49-55
Saryono. Metode Penelitian Kualitatif, Alfabeta. Bandung. 2010
Sedarmayanti. Tata kerja dan Produktivitas kerja. Tinjauan dari aspek ergonomi atau kaitan antara manusia dengan lingkungan kerjanya. Mandar Maju. 2011.
Sekaran, U., Bougie, R. Research methods for business. New York: John Wiley & Sons. 2010
Selviana. Pentingnya K3(Keselamatan dan Kesehatan Kerja) dalam Meningkatkan Produktivitas kerja. Buletin KPIN, Vol 3, No. 10, Oktober 2017
Soepardi, H., Bambang, P.A., Arief, N. W. Pengaruh Produktivitas Kerja Terhadap Keterlambatan Pelaksanaan Proyek Konstruksi Bangunan. Prosiding Temu Ilmiah IPLBI, 2017, C043-C052
Sunyoto, D. Teori, Kuesioner, dan Analisis Data Sumber Daya Manusia (Praktik Penelitian), Yogyakarta. CAPS
Supardi. Aplikasi Statistika dalam Penelitian, Change Publication, Jakarta.2013 The Constructor.org. Delays in Construction Projects, Its Types, Effects and Management
Trijono, R. Metode Penelitian Kauntitatif. Papas Sinar Sinanti, Jakarta. 2015
Undang-undang RI No. 28 Tahun 2002 tentang Bangunan Gedung
ibisono, D. PanduanPenyusunan Skripsi, Tesis dan Disertasi. Andi. Yogyakarta. 2013 www.id.m.wikipedia.org. Kontraktor
Yunita, A.M., Theodorus, W., Marisya, L. A. Kajian Penyebab Keterlambatan Pelaksanaan Proyek Konstruksi Gedung di Kota Kupang. Jurnal Teknik Sipil, Vol 11, No.2, September 2013
Downloads
Published
How to Cite
Issue
Section
License
License and Copyright Agreement
In submitting the manuscript to the journal, the authors certify that:
- They are authorized by their co-authors to enter into these arrangements.
- The work described has not been formally published before, except in the form of an abstract or as part of a published lecture, review, thesis, or overlay journal.
- That it is not under consideration for publication elsewhere.
- That its release has been approved by all the author(s) and by the responsible authorities – tacitly or explicitly – of the institutes where the work has been carried out.
- They secure the right to reproduce any material that has already been published or copyrighted elsewhere.
- They agree to the following license and copyright agreement.
Copyright
Authors who publish with International Journal of Engineering Technologies and Management Research agree to the following terms:
- Authors retain copyright and grant the journal right of first publication with the work simultaneously licensed under a Creative Commons Attribution License (CC BY-SA 4.0) that allows others to share the work with an acknowledgment of the work's authorship and initial publication in this journal.
- Authors can enter into separate, additional contractual arrangements for the non-exclusive distribution of the journal's published version of the work (e.g., post it to an institutional repository or edit it in a book), with an acknowledgment of its initial publication in this journal.
- Authors are permitted and encouraged to post their work online (e.g., in institutional repositories or on their website) before and during the submission process, as it can lead to productive exchanges, as well as earlier and greater citation of published work.
For More info, please visit CopyRight Section