ANALYSIS OF COMPARISON OF CERAMIC FLOOR INSTALLATION PRODUCTIVITY AND WAGE COST BASED ON LABOR COMPOSITION
DOI:
https://doi.org/10.29121/ijetmr.v9.i6.2022.1176Keywords:
Productivity, Wage Cost, Floor Ceramic, LaborAbstract
Completion time of construction project that consist of many work items should not exceeds the given time requirement and the cost should not exceeds the planned budget. This study analyzed a work item that is floor ceramic installation by acquiring the comparison of labor productivity and the comparison of wage cost based on different labor compositions. Out of the three (3) studied labor compositions in floor ceramic installation, the composition that consist of 2(two) masons and 2(two) journeymen produces the highest productivity that is 1,73 m2 and based on the productivity the incurred wage cost, composition 2(two) is the cheapest with IDR. 9.046,-/m2.
Downloads
References
Laksono, T. D., Wiyanti, D. S. (2021). The Analysis of Comparison of Floor Ceramic Installation Productivity Based on The Composition of Labor, 8(7), 19-25.
https://doi.org/10.29121/ijetmr.v8.i7.2021.985 DOI: https://doi.org/10.29121/ijetmr.v8.i7.2021.985
Ervianto, W. I. (2004). Teori Aplikasi Manajemen Proyek Konstruksi (Theory of Management Application of Consctruction Project), Andi Offset, Yogyakarta. https://d1wqtxts1xzle7.cloudfront.net/32193845/sinopsis-Teori_aplikasi_manajemen_proyek_konstruksi-with-cover-page-v2.pdf?Expires=1655803879&Signature=UvgjlZRzJIWe9bMOORV7EJZtRHM7ESw9EiuPX2ZAeruad7nwggArzsqPnt5XtzFB-FXFIlN29yMavXqbdC1n7M~8Ov0y1YauqaBNJa8LfW8KeP1nQen-V1SswvRl5rBWrAXQAn9cL4~Wvi2wmblMqv8VJmXB~ArHa5aip9FtQek6Z6KMcbl7LwxYTWgevx8NZrx57knVIfGml9N6nLjCr9zSexvUVYcQ~LwfLtJgCj4U~xHfHc6XqzF2Tk30yK3y~YQNrZLwM9J-kJ3TsaSXOiu3FaqDA8Sl~jbY78~76eQzQhGpCtR2HZjsW7RiY47jNvWO~tWnlyJIfdHFI4QFxw__&Key-Pair-Id=APKAJLOHF5GGSLRBV4ZA
Ervianto, W. I. (2005). Manajemen Proyek Konstruksi (Construction Project Management), Edisi Revisi, Andi offset, Yogyakarta.
Harijanto, S. (2006). Efektivitas waktu kerja kelompok tukang (Work time effectivity of mason team), Jurnal Teknik Sipil (civil engineering journal , 7(1).
Alfianarrochmah, I. Sigit, A. (2019). Analisis Produktivitas Tenaga Kerja Pekerjaan Pemasangan Keramik dengan Menggunakan Metode MPDM (Analysis of Labor Productivity in Floor Ceramic Installation by MPDM Method)(Studi Kasus Proyek Rumah Kost Daerah Sleman, Yogyakarta ), Case study of boarding house project in Sleman, Yogyakarta. https://dspace.uii.ac.id/handle/123456789/14032
Sleman (2019). Analysis of Labor Productivity in Floor Ceramic Installation by MPDM Method.
Istiyati, Y. (2017). Analisis Produktivitas Pekerjaan Pemasangan Keramik pada Daerah Luas dan Sempit kaitannya dengan RAB dan RAP (Studi Kasus Proyek Pembangunan EL Kost Maguwoharjo Depok Sleman Yogyakarta), UII, Yogyakarta, Analysis of Floor Ceramic Installation Productivity in wide and narrow area related to Budget Plan and Project Plan, Case study at boarding house EL construction project in Depok, Sleman, Yogyakarta. https://dspace.uii.ac.id/handle/123456789/5202
Mulyadarma, D. A. (2020). Analisis Produktivitas Pekerjaan Pemasangan Keramik dengan MPDM (Method Productivy Delay Model) yang Berkaitan dengan RAP dan Realisasi Anggaran Pelaksanaan, UII, Yogyakarta, UII Productivity Analysis of Floor Ceramic Installation using MPDM (Method Productivy Delay Model) in relation to Project Budget and Budget Reaization. https://dspace.uii.ac.id/handle/123456789/29983?show=full
Nasrul, (2016). Studi Analisis Perbandingan Komposisi Tenaga Kerja pada Pekerjaan Pemasangan Keramik antara SNI dan di lapangan, ITP, Study of Analysis of Comparison between SNI 2013 Floor Ceramic Installation labor composition and its Implementation.
Pamuji, (2008). Pengukuran produktivitas pekerja sebagai dasar perhitungan upah kerja pada anggaran biaya, Tugas Akhir Program Studi Teknik Sipil, Universitas Sumatera Utara. Measurement of Labor Productivity as the Basis for Calculating Wages in Budget, Civil Engineering Thesis.
Soeharto, I. (1999). Manajemen Proyek dari Konseptual Sampai Operasional, Erlangga, Jakarta, Project Management from Conceptual to Operational.
Sritomo, W. (1995). Ergonomi, Studi Gerak dan Waktu, Edisi Pertama, Guna Widya, Jakarta, Ergonomic of Motion and Time Studies, First Edition.
Sugiyono, (2011). Metode Penelitian Kuantitatif Kualitatif dan R & D, Alfabeta, Bandung, Quantitative, Qulaitative, and R&D Research Method. https://digilib.unigres.ac.id/index.php?p=show_detail&id=43
Zainuri, Z. Yanti, G. & Megasari, S. W. (2015). Analisis Produktivitas Tukang Keramik, Siklus : Jurnal Teknik Sipil, 1(1), 109-118. http://journal.unilak.ac.id/index.php/SIKLUS/article/view/176
Published
How to Cite
Issue
Section
License
Copyright (c) 2022 Dwi Sri Wiyanti, Taufik Dwi Laksono
This work is licensed under a Creative Commons Attribution 4.0 International License.
License and Copyright Agreement
In submitting the manuscript to the journal, the authors certify that:
- They are authorized by their co-authors to enter into these arrangements.
- The work described has not been formally published before, except in the form of an abstract or as part of a published lecture, review, thesis, or overlay journal.
- That it is not under consideration for publication elsewhere.
- That its release has been approved by all the author(s) and by the responsible authorities – tacitly or explicitly – of the institutes where the work has been carried out.
- They secure the right to reproduce any material that has already been published or copyrighted elsewhere.
- They agree to the following license and copyright agreement.
Copyright
Authors who publish with International Journal of Engineering Technologies and Management Research agree to the following terms:
- Authors retain copyright and grant the journal right of first publication with the work simultaneously licensed under a Creative Commons Attribution License (CC BY-SA 4.0) that allows others to share the work with an acknowledgment of the work's authorship and initial publication in this journal.
- Authors can enter into separate, additional contractual arrangements for the non-exclusive distribution of the journal's published version of the work (e.g., post it to an institutional repository or edit it in a book), with an acknowledgment of its initial publication in this journal.
- Authors are permitted and encouraged to post their work online (e.g., in institutional repositories or on their website) before and during the submission process, as it can lead to productive exchanges, as well as earlier and greater citation of published work.
For More info, please visit CopyRight Section