ANALYSIS OF COMPARISON OF CERAMIC FLOOR INSTALLATION PRODUCTIVITY AND WAGE COST BASED ON LABOR COMPOSITION

Authors

  • Dwi Sri Wiyanti Civil Engineering, Faculty of Engineering, Wijayakusuma University Purwokerto, Jl.BejiKampusKarangsalamPurwokerto Indonesia 53152
  • Taufik Dwi Laksono Civil Engineering, Faculty of Engineering, Wijayakusuma University Purwokerto, Jl.Beji Kampus Karangsalam Purwokerto Indonesia 53152

DOI:

https://doi.org/10.29121/ijetmr.v9.i6.2022.1176

Keywords:

Productivity, Wage Cost, Floor Ceramic, Labor

Abstract

Completion time of construction project that consist of many work items should not exceeds the given time requirement and the cost should not exceeds the planned budget. This study analyzed a work item that is floor ceramic installation by acquiring the comparison of labor productivity and the comparison of wage cost based on different labor compositions. Out of the three (3) studied labor compositions in floor ceramic installation, the composition that consist of 2(two) masons and 2(two) journeymen produces the highest productivity that is 1,73 m2 and based on the productivity the incurred wage cost, composition 2(two) is the cheapest with IDR. 9.046,-/m2.

Downloads

Download data is not yet available.

References

Laksono, T. D., Wiyanti, D. S. (2021). The Analysis of Comparison of Floor Ceramic Installation Productivity Based on The Composition of Labor, 8(7), 19-25.

https://doi.org/10.29121/ijetmr.v8.i7.2021.985 DOI: https://doi.org/10.29121/ijetmr.v8.i7.2021.985

Ervianto, W. I. (2004). Teori Aplikasi Manajemen Proyek Konstruksi (Theory of Management Application of Consctruction Project), Andi Offset, Yogyakarta. https://d1wqtxts1xzle7.cloudfront.net/32193845/sinopsis-Teori_aplikasi_manajemen_proyek_konstruksi-with-cover-page-v2.pdf?Expires=1655803879&Signature=UvgjlZRzJIWe9bMOORV7EJZtRHM7ESw9EiuPX2ZAeruad7nwggArzsqPnt5XtzFB-FXFIlN29yMavXqbdC1n7M~8Ov0y1YauqaBNJa8LfW8KeP1nQen-V1SswvRl5rBWrAXQAn9cL4~Wvi2wmblMqv8VJmXB~ArHa5aip9FtQek6Z6KMcbl7LwxYTWgevx8NZrx57knVIfGml9N6nLjCr9zSexvUVYcQ~LwfLtJgCj4U~xHfHc6XqzF2Tk30yK3y~YQNrZLwM9J-kJ3TsaSXOiu3FaqDA8Sl~jbY78~76eQzQhGpCtR2HZjsW7RiY47jNvWO~tWnlyJIfdHFI4QFxw__&Key-Pair-Id=APKAJLOHF5GGSLRBV4ZA

Ervianto, W. I. (2005). Manajemen Proyek Konstruksi (Construction Project Management), Edisi Revisi, Andi offset, Yogyakarta.

Harijanto, S. (2006). Efektivitas waktu kerja kelompok tukang (Work time effectivity of mason team), Jurnal Teknik Sipil (civil engineering journal , 7(1).

Alfianarrochmah, I. Sigit, A. (2019). Analisis Produktivitas Tenaga Kerja Pekerjaan Pemasangan Keramik dengan Menggunakan Metode MPDM (Analysis of Labor Productivity in Floor Ceramic Installation by MPDM Method)(Studi Kasus Proyek Rumah Kost Daerah Sleman, Yogyakarta ), Case study of boarding house project in Sleman, Yogyakarta. https://dspace.uii.ac.id/handle/123456789/14032

Sleman (2019). Analysis of Labor Productivity in Floor Ceramic Installation by MPDM Method.

Istiyati, Y. (2017). Analisis Produktivitas Pekerjaan Pemasangan Keramik pada Daerah Luas dan Sempit kaitannya dengan RAB dan RAP (Studi Kasus Proyek Pembangunan EL Kost Maguwoharjo Depok Sleman Yogyakarta), UII, Yogyakarta, Analysis of Floor Ceramic Installation Productivity in wide and narrow area related to Budget Plan and Project Plan, Case study at boarding house EL construction project in Depok, Sleman, Yogyakarta. https://dspace.uii.ac.id/handle/123456789/5202

Mulyadarma, D. A. (2020). Analisis Produktivitas Pekerjaan Pemasangan Keramik dengan MPDM (Method Productivy Delay Model) yang Berkaitan dengan RAP dan Realisasi Anggaran Pelaksanaan, UII, Yogyakarta, UII Productivity Analysis of Floor Ceramic Installation using MPDM (Method Productivy Delay Model) in relation to Project Budget and Budget Reaization. https://dspace.uii.ac.id/handle/123456789/29983?show=full

Nasrul, (2016). Studi Analisis Perbandingan Komposisi Tenaga Kerja pada Pekerjaan Pemasangan Keramik antara SNI dan di lapangan, ITP, Study of Analysis of Comparison between SNI 2013 Floor Ceramic Installation labor composition and its Implementation.

Pamuji, (2008). Pengukuran produktivitas pekerja sebagai dasar perhitungan upah kerja pada anggaran biaya, Tugas Akhir Program Studi Teknik Sipil, Universitas Sumatera Utara. Measurement of Labor Productivity as the Basis for Calculating Wages in Budget, Civil Engineering Thesis.

Soeharto, I. (1999). Manajemen Proyek dari Konseptual Sampai Operasional, Erlangga, Jakarta, Project Management from Conceptual to Operational.

Sritomo, W. (1995). Ergonomi, Studi Gerak dan Waktu, Edisi Pertama, Guna Widya, Jakarta, Ergonomic of Motion and Time Studies, First Edition.

Sugiyono, (2011). Metode Penelitian Kuantitatif Kualitatif dan R & D, Alfabeta, Bandung, Quantitative, Qulaitative, and R&D Research Method. https://digilib.unigres.ac.id/index.php?p=show_detail&id=43

Zainuri, Z. Yanti, G. & Megasari, S. W. (2015). Analisis Produktivitas Tukang Keramik, Siklus : Jurnal Teknik Sipil, 1(1), 109-118. http://journal.unilak.ac.id/index.php/SIKLUS/article/view/176

Downloads

Published

2022-06-29

How to Cite

Wiyanti, D. S., & Laksono, T. D. (2022). ANALYSIS OF COMPARISON OF CERAMIC FLOOR INSTALLATION PRODUCTIVITY AND WAGE COST BASED ON LABOR COMPOSITION . International Journal of Engineering Technologies and Management Research, 9(6), 71–77. https://doi.org/10.29121/ijetmr.v9.i6.2022.1176

Most read articles by the same author(s)