THE COMPLEXITIES ENCOUNTERED BY INDEPENDENT POWER PRODUCERS IN SMALL HYDRO POWER PROJECTS: A CASE STUDY OF HIMACHAL PRADESH IN THE INDIAN HIMALAYAN REGION.
DOI:
https://doi.org/10.29121/shodhkosh.v5.i1.2024.3317Keywords:
Green Energy, Renewable Energy, Small Hydro Power Projects, Independent Power Producers, Hydroelectricity, Sustainable Power ProductionAbstract [English]
The Indian government has undertaken various initiatives aimed at fostering the growth of the small hydropower industry in collaboration with the private sector. However, despite these efforts, there has been a consistent decline in the proportion of hydropower within the overall energy mix over the years. Given this context, the primary objective of this article is to pinpoint the challenges and obstacles encountered by Independent Power Producers in the establishment of small hydropower projects in Himachal Pradesh. The study, conducted through a combination of primary and secondary sources, aims to identify the factors hindering the successful implementation of such projects. The findings of the study indicate that despite the introduction of a new hydro power policy by the state of Himachal Pradesh in 2006, aimed at unlocking the underutilized power potential by promoting private sector involvement in small hydropower generation, there persists a significant disparity between the available capacity and the installed capacity in the state. This gap can be attributed to a multitude of financial and non-financial challenges faced by Independent Power Producers through out the planning, construction and operations phases of their projects.
References
Agarwal, S. S., & Kansal, M. L. (2017). Issues of hydropower develpoment in Uttrakhand region of Indian Himalaya. Water and Energy International.
Baker, J. M. (2014). Small Hydropower Development in Himachal Pradesh: An Analysis of Socioecological Effects. Economic and Political Weekly, 49(21), 77-86.
century, R. e. (2021). Renewables 2021 Global Status Report. Paris.
Commission, T. H. (2015, 6 30). Determination of generic levellised tariffs for Small Hydro Projects under Regulation 13 of the Himachal Pradesh Electricity Regulations, 2012- Mechanisms for adjustment of accelerated depreciation benefit and capital subsidy. Shimla: Government of Himachal Pradesh.
Energy, S. C. (2019). Forty-third Report on Hydro Power (2018–19). New Delhi: Lok Sabha Secretariat. Retrieved 7 5, 2022, from http://www.indiaenvironmentportal.org.in/files/file/Hydro-power.pdf
Himurja, G. o. (2019, September). Guidelines for private investors for participation in small hydro programme in Himachal Pradesh (upto 5.00 MW). Retrieved 7 5, 2022, from www.himurja.hp.gov.in: http://himurja.hp.gov.in/wp-content/uploads/2019/09/Broachure-2019-I.pdf
India, C. e. (2019). Hydro Review of performance of hydro power stations 2018-19. New Delhi: Government of India.
Information and public relations Department, G. o. (2022, May 25). CM presides over meeting of Hydro Electric Power Projects. Retrieved July 27, 2022, from http://www.himachalpr.gov.in/(S(lpj1aqyzzchyrvjbskrusotm))/OnePressRelease.aspx?Language=1&ID=25906
Limited, A. I. (2016). Hydropower @ Crossroads. New Delhi: Pricewaterhouse cooper Private Limited.
Ministry of New and Renewable Energy, G. o. (2017). Evaluation of Small Hydro Power Programme of MNRE. New Delhi : Government of India.
Ministry of Power, G. o. (2022, June 27). Retrieved from https://powermin.gov.in/en/content/overview
MNRE. (2022, july). Retrieved from www.mnre.gov.in: https://mnre.gov.in/small-hydro/current-status
Mukherji, A., Molden, D., Nepal, S., Rasul, G., & Wagnon, P. (2015). Himalayan waters at the crossroads: issues and challenges. International Journal of Water Resources Development, 151-160. doi:https://doi.org/10.1080/07900627.2015.1040871 DOI: https://doi.org/10.1080/07900627.2015.1040871
Singh, M. P. (2017, 12 5). Hydro Power Scenario in Himachal Pradesh. Electrical India. Retrieved 7 6, 2022, from https://www.electricalindia.in/hydro-power-scenario-in-himachal-pradesh/
Tiwari, A. N. (2012). Tunnelling in the Himalayan Region: geological problems and solutions. International Water Power and Dam Construction.
TNN. (2019, August 29). Hydel projects becoming unviable matter of concern: Himachal Pradesh CM. Energyworld.com by The Economic Times. Retrieved July 18, 2022, from https://energy.economictimes.indiatimes.com/news/renewable/hydel-projects-becoming-unviable-matter-of-concern-himachal-pradesh-cm/70890224
Verma, R. K. (2018). Oorja Rajya ka Sapna: Nakaratmakta ke Mayajaal Main. New Delhi: Prabhat Prakashan.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2024 Arvuda Mehta

This work is licensed under a Creative Commons Attribution 4.0 International License.
With the licence CC-BY, authors retain the copyright, allowing anyone to download, reuse, re-print, modify, distribute, and/or copy their contribution. The work must be properly attributed to its author.
It is not necessary to ask for further permission from the author or journal board.
This journal provides immediate open access to its content on the principle that making research freely available to the public supports a greater global exchange of knowledge.