NUMERICAL STUDY OF OPTIMAL BUFFER SIZE AND VACATION LENGTH IN M/G/1/K QUEUES WITH MULTIPLE VACATIONS
DOI:
https://doi.org/10.29121/ijetmr.v6.i2.2019.350Keywords:
M/G/1/K Queues, Multiple Vacations, Optimal Buffer Size, Optimal Vacation LengthAbstract
Nowadays, due to the advent of clouding computing, buffer size can be readily extended in a couple of minutes for computing servers, where the buffer size should not be considered as given when optimizing the system performance. In this context, we explore optimal combinations for the buffer size and the length of vacation time in M/G/1/K queues with multiple vacations numerically. We consider the cases of deterministic and exponentially distributed vacation and service times. In order to do this, we also formulate an optimal problem and define cost factors: the customer loss cost, the buffer holding cost, and the server operating cost. We present some numerical examples to investigate the impact of the system parameters such as the buffer size, the length of the vacation time, and the distribution of the service time, to performance measures and the total cost. We also investigate optimal combinations for the buffer size and the vacation length for various values of the cost factors.
Downloads
References
R. Zheng, J. C. Hou, and L. Sha, “Performance analysis of power management policies in wireless networks,” IEEE Transactions on Wireless Communications, vol. 5, no. 6, pp. 1351–1361, 2006.
K. De Turck, S. De Vuyst, D. Fiems, S. Wittevrongel, and H. Bruneel, “Performance of the sleepmode mechanism of the new ieee 802.16 m proposal for correlated downlink traffic,” in International conference on network control and optimization, 2009, pp. 152–165. DOI: https://doi.org/10.1007/978-3-642-10406-0_11
C.-Y. Chen, C.-H. Hsu, and K.-T. Feng, “Performance analysis and comparison of sleep mode operation for ieee 802.16 m advanced broadband wireless networks,” in Personal indoor and mobile radio communications (pimrc), 2010 ieee 21st international symposium on, 2010, pp. 1425–1430.
H. K. Aksoy and S. M. Gupta, “Optimal management of remanufacturing systems with server vacations,” The International Journal of Advanced Manufacturing Technology, vol. 54, nos. 9-12, pp. 1199–1218, 2011.
T. T. Lee, “M/g/1/n queue with vacation time and exhaustive service discipline,” Operations Research, vol. 32, no. 4, pp. 774–784, 1984. DOI: https://doi.org/10.1287/opre.32.4.774
T. T. Lee, “M/g/1/n queue with vacation time and limited service discipline,” Performance Evaluation, vol. 9, no. 3, pp. 181–190, 1989. DOI: https://doi.org/10.1016/0166-5316(89)90025-4
H. Takagi, “M/g/1/k queues with n-policy and setup times,” Queueing systems, vol. 14, nos. 1-2, pp. 79–98, 1993. DOI: https://doi.org/10.1007/BF01153527
S. Kasahara, Y. Takahashi, and T. Hasegawa, “Analysis of waiting time of m/g/1/k system with vacations under random scheduling and lcfs,” Performance evaluation, vol. 21, no. 3, pp. 239–259, 1995. DOI: https://doi.org/10.1016/0166-5316(93)E0046-8
A. Frey and Y. Takahashi, “A note on an m/gi/1/n queue with vacation time and exhaustive service discipline,” Operations research letters, vol. 21, no. 2, pp. 95–100, 1997. DOI: https://doi.org/10.1016/S0167-6377(97)00027-8
K.-H. Wang and J.-C. Ke, “A recursive method to the optimal control of an m/g/1 queueing system with finite capacity and infinite capacity,” Applied Mathematical Modelling, vol. 24, no. 12, pp. 899–914, 2000. DOI: https://doi.org/10.1016/S0307-904X(00)00024-X
K.-H. Wang, C.-C. Kuo, and W. Pearn, “Optimal control of an m/g/1/k queueing system with combined f policy and startup time,” Journal of Optimization Theory and Applications, vol. 135, no. 2, pp. 285–299, 2007. DOI: https://doi.org/10.1007/s10957-007-9253-6
Y. Park and G. U. Hwang, “An efficient power saving mechanism for delay-guaranteed services in ieee 802.16 e,” IEICE transactions on communications, vol. 92, no. 1, pp. 277–287, 2009. DOI: https://doi.org/10.1587/transcom.E92.B.277
Downloads
Published
How to Cite
Issue
Section
License
License and Copyright Agreement
In submitting the manuscript to the journal, the authors certify that:
- They are authorized by their co-authors to enter into these arrangements.
- The work described has not been formally published before, except in the form of an abstract or as part of a published lecture, review, thesis, or overlay journal.
- That it is not under consideration for publication elsewhere.
- That its release has been approved by all the author(s) and by the responsible authorities – tacitly or explicitly – of the institutes where the work has been carried out.
- They secure the right to reproduce any material that has already been published or copyrighted elsewhere.
- They agree to the following license and copyright agreement.
Copyright
Authors who publish with International Journal of Engineering Technologies and Management Research agree to the following terms:
- Authors retain copyright and grant the journal right of first publication with the work simultaneously licensed under a Creative Commons Attribution License (CC BY-SA 4.0) that allows others to share the work with an acknowledgment of the work's authorship and initial publication in this journal.
- Authors can enter into separate, additional contractual arrangements for the non-exclusive distribution of the journal's published version of the work (e.g., post it to an institutional repository or edit it in a book), with an acknowledgment of its initial publication in this journal.
- Authors are permitted and encouraged to post their work online (e.g., in institutional repositories or on their website) before and during the submission process, as it can lead to productive exchanges, as well as earlier and greater citation of published work.
For More info, please visit CopyRight Section