ASSESSMENT OF CAUSE OF HULUKA MICRO HYDRO POWER SCHEME FAILURE AND ESTIMATION OF ITS POTENTIAL

Authors

  • Tibebu Tsegaye Zigale Department of Hydraulic and Water Resources Engineering, Institute of Technology, Ambo University P.O Box 19, Ambo, Ethiopia
  • Teressa Negassa Muleta Department of Hydraulic and Water Resources Engineering, Institute of Technology, Ambo University P.O Box 19, Ambo, Ethiopia
  • Mubarek Jemal Mohammed Department of Hydraulic and Water Resources Engineering, Institute of Technology, Ambo University P.O Box 19, Ambo, Ethiopia

DOI:

https://doi.org/10.29121/granthaalayah.v7.i8.2019.672

Keywords:

Cause of Failure, Flow Duration Curve, Micro Hydropower, Rehabilitation

Abstract [English]

In Ethiopia, several Micro hydropower (MHP) schemes were constructed between the year 1950 and 1970. One of the Micro hydropower schemes constructed within this period was Huluka Micro-hydropower. However, it is no longer operational nowadays due to some issues and problems. Hence, this research study aimed to assess the causes of failure and estimating the potential power of Huluka micro hydropower. The overall existing condition of the components of the Micro hydropower plants evaluated as to functionality and its physical measurements, including the identification of the potential factors responsible for the failure of the Micro hydropower. From the flow duration curve of Huluka River, it indicated a maximum and the minimum potential power of the scheme of about 1313.23kw, and 274.41 kW, respectively. Hence, it is postulated that rehabilitation of Huluka MHP could provide a solution to the current shortage and interruption of power supply in Ambo town as well as its surrounding areas.

Downloads

Download data is not yet available.

References

A. W. Dametew, " Design and Analysis of mall Hydropower for Rural Electrification," Global Journal of Researches in Engineering (2016).

D. M. Degefu, W. He and J. H. Zhao, " Hydropower for Sustainable water and Energy Development in Ethiopia," Springer (2015). DOI: https://doi.org/10.1007/s40899-015-0029-0

M.o. W. a. E. Ethiopia, "Scaling-up Renewable Energy Programme" (2012).

M. Shanko, " Target Market Analysis: Ethiopia's Small Hydro Energy Market, " pp. 409-415, 2009.

Abebe (2011). Assessment of Micro-Hydropower Potential of Selected Ethiopia Rivers-A Case Study in the Northeast part of the Country.

Dereje (2013). Ethiopia's Renewable Energy Power Potential and Development Opportunities. Ministry of Water and Energy, Abu Dhabi, UEA.

Federal Democratic Republic of Ethiopia Ministry of Water Resources (2005). Anay River Basin Integrated Development Master Plan Study Project, Climatology, March 2005.

Nardos, 2001. Upgrading of Mini-Hydropower plants (The case of Yadot Mini-Hydro power plant).

V. Van der Zwaan et al.; Energy Strategy Reviews 19 (2018), 19-30. Prospect for Hydropower in Ethiopia: An Energy-Water Nexus Analysis. DOI: https://doi.org/10.1016/j.esr.2017.11.001

Downloads

Published

2019-08-31

How to Cite

Zigale, T. T., Muleta, T. N., & Mohammed, M. J. (2019). ASSESSMENT OF CAUSE OF HULUKA MICRO HYDRO POWER SCHEME FAILURE AND ESTIMATION OF ITS POTENTIAL. International Journal of Research -GRANTHAALAYAH, 7(8), 292–300. https://doi.org/10.29121/granthaalayah.v7.i8.2019.672