DETAIL OF PARSING LITHOLOGICAL MEMBERS OF THE TERRAIN AND EMBANKMENT ALONG THE ROUTE OF THE RAILWAY SAMAC - SARAJEVO, CORRIDOR V, SECTION CHAINAGE KM 85 + 000 – 103+500, BOSNIA AND HERZEGOVINA

Authors

  • NedjoDjuric Technical institute Bijeljina, Bosnia and Herzegovina
  • DijanaDjuric Technical institute Bijeljina, Bosnia and Herzegovina

DOI:

https://doi.org/10.29121/granthaalayah.v4.i12.2016.2390

Keywords:

Parsing, Lithological Members, Research Works

Abstract [English]

Revitalization of the railways is a started project of the European Union, where is necessary for all the tracks of the former Yugoslavia to be revitalized in order to improve their train speed quality up to 120 km / hour. The railway that passes through the middle of Bosnia and Herzegovina, from north to south, is the Corridor Vc and connects Budapest, that is Central Europe with the Adriatic Sea. The largest part of the railway was revitalized, and researched section is one of several remaining that need to be investigated in detail before revitalized. It is expected its full completion by 2010. During the research of mentioned section, in detail were studied the characteristics of the terrain and the buffer layer of railway along its route. The level of detail was such that it had allocated all the characteristics of lithological members and embankments per chainages.

Downloads

Download data is not yet available.

References

Laušević, M., Jovanović, Č., Mojičević, M. Basic geological map of Yugoslavia, sheet Doboj, R 1: 100000, and OGC interpreter. Federal Geological Institute, Belgrade, Serbia, 1980.

Đurić, N. Hidrogeološkaiinženjersko-geološkaistraživanja. Građevinskifakultet Subotica, SrbijaiTehničkiinstitutBijeljina, Bosna i Hercegovina, 2011.

Group of authors. The program engineering geological, hydrogeological and geotechnical investigation works for the section of the highway corridor Vc, Doboj Jug. IPSA Sarajevo. Fond of professional documents IPSA Sarajevo, Technical Institute Bijeljina, Bosnia and Herzegovina, 2012.

Project: WB5-BH-TRA-14. The main repair services stripes section Doboj - Maglaj and Jelina - Zenica on Corridor Vc PHASE II: Main project, section Doboj - km 103 + 500th Book 4. Geological - geotechnical study. Technical Institute, Bijeljina, Bosnia and Herzegovina, 2013.

Ćulibrk, S. R. Geotehničkiradovi u niskogradnji. Građevinskifakultet Subotica, Rudarsko-geološkifakultet Beograd, Srbija, 1996.

Najdanović, N., Obradović, R. Mehanikatla u inženjerskojpraksi. Beograd, Rudarskiinstitut, Beograd, Srbija, 1979.

Bowles, J. Fondation analysis and desing. Exoloration, sampling and in situ soil measurements. Fifth edition. McGraw Hill Higher Education, 1997.

Eurocode 7. Geotechnical desing – Part 2: Desing assisted by laboratory testing and Part 3: Desing assisted by fieldtesting. European Commitete for standarization.

Downloads

Published

2016-12-31

How to Cite

Djuric, N., & Djuric, D. (2016). DETAIL OF PARSING LITHOLOGICAL MEMBERS OF THE TERRAIN AND EMBANKMENT ALONG THE ROUTE OF THE RAILWAY SAMAC - SARAJEVO, CORRIDOR V, SECTION CHAINAGE KM 85 + 000 – 103+500, BOSNIA AND HERZEGOVINA. International Journal of Research -GRANTHAALAYAH, 4(12), 34–40. https://doi.org/10.29121/granthaalayah.v4.i12.2016.2390