EXAMINING THE FACTORS CONFRONTING THE EXECUTION OF GETFUND CONSTRUCTION PROJECTS IN THE UPPER WEST REGION, GHANA
DOI:
https://doi.org/10.29121/granthaalayah.v12.i2.2024.5389Keywords:
GETFund, Factors, Projects, Problems, Execution, InefficienciesAbstract [English]
GETFund's primary goal is to offer a specialized financial source to increase government budgetary allotments for the construction of educational infrastructure at all educational levels, from pre-tertiary to tertiary, as specified in the GETFund (2000). The aim of this study is to examine the managerial skills and issues that GETFund contractors employ. The aim of this study is to investigate the challenges faced by GETFund construction project managers, pinpoint the factors that affect GETFund project performance, and suggest practical solutions to improve GETFund project execution in the Upper West Region. For this study, a descriptive survey research design was chosen. One hundred and forty-eight construction firms, twenty-one consultancies, and sixty-five clients made up the sample for the study. A questionnaire was the main method used to collect data. A descriptive statistical analysis was performed on the data. The study's conclusions showed that political and financial issues are the main barriers to the effective execution of GETFund building projects. Moreover, scheduling, and financial issues pose the biggest obstacles to the region's successful implementation of GETFund construction projects. Furthermore, the survey found that the majority of contractors' agents carrying out GETFund projects lack the technical expertise, resources, and manpower required, which makes it challenging for them to comprehend and interpret the criteria and drawings that project consultants provide them. According to the report, in-service training should be offered by reputable regulatory organizations like the Building and Road Research Institute (BRRI) to improve employees' capacity to manage firms.
Downloads
References
Chan, D., & Kumaraswamy, M. (2002). Compressing Construction Durations: Lessons Learned from Hong Kong Building Projects. International Journal of Project Management, 20(1), 23-35. https://doi.org/10.1016/S0263-7863(00)00032-6 DOI: https://doi.org/10.1016/S0263-7863(00)00032-6
Dissanayaka, S. M., & Kumaraswamy, M. M. (1998). Comparing Contributors to Time and Cost Performance in Building Projects. Building and Environment, 34(1), 31-42. https://doi.org/10.1016/S0360-1323(97)00068-1 DOI: https://doi.org/10.1016/S0360-1323(97)00068-1
Frimpong, K., & Oluwoye, O. (2003). Causes of Delay and Cost Overruns in Construction of Groundwater Projects in a Developing Country; Ghana as a Case Study. International Journal of Project Management, 21, 321-326. https://doi.org/10.1016/S0263-7863(02)00055-8 DOI: https://doi.org/10.1016/S0263-7863(02)00055-8
Fugar, F., & Agyarkwa, A. (2010). Delays in Building Construction in Ghana. Australian Journal of Construction Economics and Building, 10, 103-116. https://doi.org/10.5130/ajceb.v10i1/2.1592 DOI: https://doi.org/10.5130/ajceb.v10i1/2.1592
GETFund, G. (2000, May 09). Ghana Education Trust Fund Act 2000, Act 581, Ministry of Education. Republic of Ghana: Parliament of Ghana.
Ghana News. (2009, April 7). The Construction Problem in Ghana the Way Forward. Retrieved June 20th, 2019, from The construction problem in Ghana: The Way Forward.
Jones, A. H., Martindale, J. R., Morris, J., & Morris, J. (1980). The Prosopography of the Later Roman Empire: (Vol. 2). Cambridge University Press.
Joppe, M. (2000). The Research Process. Retrieved From 1998, February 25.
Kuprenas, J. A. (2003). Project Management Actions to Improve Design Phase Cost Performance. Journal of Management in Engineering, 19(1), 25-32. DOI: https://doi.org/10.1061/(ASCE)0742-597X(2003)19:1(25)
Lehtonen, T. W. (2001). Performance Measurement in Construction Logistics. International Journal of Production Economics, 69, 107-116. https://doi.org/10.1016/S0925-5273(00)00034-7 DOI: https://doi.org/10.1016/S0925-5273(00)00034-7
Mahmoud-Jouini, S. B., Midler, C., & Garel, G. (2004). Time-to-Market vs. Time-to-Delivery: Managing Speed in Engineering, Procurement, and Construction Projects. International Journal of Project Management, 22(5), 359-367. https://doi.org/10.1016/j.ijproman.2003.10.001 DOI: https://doi.org/10.1016/j.ijproman.2003.10.001
Mckinsey, K., & Company. (2003). The Practice of Business Statistics. New York: Freeman.
Nkado, R. N. (1995). Construction Time-Influencing Factors: the Contractor's Perspective. Construction Management and Economics, 13(1), 81-89. https://doi.org/10.1080/01446199500000009 DOI: https://doi.org/10.1080/01446199500000009
Okuwoga, A. (1998). Cost Time Performance of Public Sector Housing Projects in Nigeria, Habital Intl., 22(4), 389-395. https://doi.org/10.1016/S0197-3975(98)00014-9 DOI: https://doi.org/10.1016/S0197-3975(98)00014-9
Olawale, Y. A., & Sun, M. (2010). Cost and Time Control of Construction Projects: Inhibiting Factors and Mitigating Measures in Practice. Construction Management and Economics, 28(5), 509-526. https://doi.org/10.1080/01446191003674519 DOI: https://doi.org/10.1080/01446191003674519
Reichelt, K., & Lyneis, J. (1999). The Dynamic of Project Performance: Benchmarking Cost and Schedule Overrun Drivers. European Management Journal, 17(2), 135-150. https://doi.org/10.1016/S0263-2373(98)00073-5 DOI: https://doi.org/10.1016/S0263-2373(98)00073-5
Roy, M., & Akintan, O. A. (2005). Improving the Collaboration Between Main Contractors and Subcontractors within Traditional Construction Procurement. Journal of Construction Engineering, 11. https://doi.org/10.1155/2013/281236 DOI: https://doi.org/10.1155/2013/281236
Xiao, H., & Proverbs, D. (2002). Construction Time Performance: An Evaluation of Contractors from the UK and US. Journal of Engineering Construction and Architectural Management, 9(2), 81-89. https://doi.org/10.1108/eb021208 DOI: https://doi.org/10.1108/eb021208
Published
How to Cite
Issue
Section
License
Copyright (c) 2024 Abdul Ganiyu Iddrisu, Abdul-Latif Mohammed, Ebenezer Annan

This work is licensed under a Creative Commons Attribution 4.0 International License.
With the licence CC-BY, authors retain the copyright, allowing anyone to download, reuse, re-print, modify, distribute, and/or copy their contribution. The work must be properly attributed to its author.
It is not necessary to ask for further permission from the author or journal board.
This journal provides immediate open access to its content on the principle that making research freely available to the public supports a greater global exchange of knowledge.