REVIEW FOR TIMELY COMPLETION OF INFRASTRUCTURE PROJECTS

Authors

  • Madan Sharma PhD Scholar, Faculty of Engineering, Lincoln University, Malaysia
  • A. K. Mishra Associate Professor and Co-Supervisor, Lincoln University, Malaysia https://orcid.org/0000-0003-2803-4918
  • Janani Selvam Professor and Research Coordinator, Lincoln University, Malaysia

DOI:

https://doi.org/10.29121/granthaalayah.v10.i11.2022.4903

Keywords:

Time, Cost, Quality, Risk, Projects, Developed, Developing

Abstract [English]

Timely completion is main concern for any project though it is a global issue basically for infrastructure construction projects. It is keen area of interest for Local and International professional and Researchers still it is a problem yet to overcome. The study confined to the Literature review followed by key informant experience through discussion with a view to strengthen the depth analysis of existing knowledge in the area to produce contextual content for smooth operation of infrastructure construction projects.
The study revealed that the uniqueness of projects is the main cause of projects delay. We are attempting to reach at society 5.0 where machine will be molding our activities. Our needs and wants would be cared by machine through data produced and sensitized. In this regard, the uniqueness of projects should be decoded after knowing the exact distribution of data on the basis of long-term data assessment. Still, it is one area where several research are needed to convert uncertainty into risk through appropriate risk probability allocation. Archrivals of projects should be systematically stored in project bank for future utilization. This research draws the attention for further empirical research and share solution on similarity of problems existing in infrastructure projects.

Downloads

Download data is not yet available.

References

Ahmad, Z. B., Anigbogu, N. A., and Molwus, J. J. (2018). Peculiarities of Road Projects’ Cost Overruns. International Journal of Scientific and Engineering Research, 9(6).

Akhund, M. A., Khoso, A. R., Memon, U., and Khahro, S. H. (2017). Time Overrun in Construction Projects of Developing Countries. Imperial Journal of Interdisciplinary Research (IJIR), 3(4), 121–124.

Al-Hazim, N., Salem, Z. A., and Ahmad, H. (2017). Delay and Cost Overrun in Infrastructure Projects in Jordan. Procedia Engineering 7th International Conference on Engineering, Project, and Production Management, Procedia Engineering 182, 182, 18–24. https://doi.org/10.1016/j.proeng.2017.03.105. DOI: https://doi.org/10.1016/j.proeng.2017.03.105

Albtoush, A. M. F., Doh, S. I., Al-Btoush, A. K. A. M., and Rahman, R. A. (2022). Techniques to Reduce Cost Overruns During the Design Phase of Construction Projects. Journal of Engineering Science and Technology, School of Engineering, Taylor’s University, 17(1), 0583–0603.

Ammar, Taher, Abdel-Monem, M., and El-Dash, K. (2022). Risk Factors Causing Cost Overruns in Road Networks. Ain Shams Engineering Journal, 13(5). https://doi.org/10.1016/j.asej.2022.101720 DOI: https://doi.org/10.1016/j.asej.2022.101720

Andrić, J. M., Mahamadu, A., Wang, J., Zou, P. X. W., and Zhong, R. (2019). The Cost Performance and Causes of Overruns in Infrastructure Development Projects in Asia. Journal of Civil Engineering and Management, 25(3), 203–214. https://doi.org/10.3846/jcem.2019.8646 DOI: https://doi.org/10.3846/jcem.2019.8646

Asian Development Bank (2017). “Meeting Asia’s Infrastructure Needs.

Bista, D. B., and Mishra, A. K. (2019). Bidding Trend and Its Effects in Implementation on Road Projects of Division Road Offices of Department of Roads, Nepal. International Journal of Advanced Research in Civil and Structural Engineering, 2(1), 1–9.

Dlamini, M., and Cumberlege, R. (2021). ‘The Impact of Cost Overruns and Delays in the Construction Business,’ The ASOCSA 14th Built Environment Conference IOP Conference Series: Earth and Environmental Science 654. IOP Publishing. https://doi.org/10.1088/1755-1315/654/1/012029 DOI: https://doi.org/10.1088/1755-1315/654/1/012029

Exactitude Consultancy UK. (2022). Construction Industry Market by Type, Building (Residential and Non-Residential) By Region (North America, Europe, Asia Pacific, South America, Middle East and Africa), Global Trends and Forecast from 2022 to 2029, Mar.

Gao, N., and Touran, A. (2020). Cost Overruns and Formal Risk Assessment Program in US Rail Transit Projects. Journal of Construction Engineering and Management – ASCE, 146(5). https://doi.org/10.1061/(ASCE)CO.1943-7862.0001827 DOI: https://doi.org/10.1061/(ASCE)CO.1943-7862.0001827

Ghimire, S., and Mishra, A. K. (2019). Comparative Study of Prospective Delay Analysis Techniques (Dats). Saudi Journal of Civil Engineering, 03(5), 84–98. https://doi.org/10.36348/SJCE.2019.v03i05.001 DOI: https://doi.org/10.36348/SJCE.2019.v03i05.001

Heravi, G., and Mohammadian, M. (2017). Cost Overruns and Delay in Municipal Construction Projects in Developing Countries. AUT Journal of Civil Engineering, 1(1), 31–38. https://doi.org/10.22060/ceej.2017.12189.5163

Malkanthi, S. N., Premalal, A. G. D., and Mudalige, R. K. P. C. B. (2017). Impact of Cost Control Techniques on Cost Overruns in Construction Projects. Engineer. Institution of Engineers, 50(4), 53–60. http://doi.org/10.4038/engineer.v50i4.7275 DOI: https://doi.org/10.4038/engineer.v50i4.7275

Mansur, S. A., Zin, R. M., and Linbo, L. (2019). Components of Cost Overrun in China Construction Projects. IOP Conference Series: Materials Science And Engineering, Sriwijaya International Conference on Science, Engineering, and Technology, 620(1). https://doi.org/10.1088/1757-899X/620/1/012081 DOI: https://doi.org/10.1088/1757-899X/620/1/012081

Mckinsey Global Institute Report. (2017). Reinventing Construction : A Route To Higher Productivity.

Mishra, A. K. (2019). Assessment of Project Performance in Terms of Time Cost and Quality. ([Doctoral Dissertation] [Phd Thesis]. Institute of Business Management, Chhatrapati Shahu Ji Maharaj University). https://doi.org/10.13140/RG.2.2.15038.84809.

Mishra, A. K. (2019). Bidders’ Competitiveness in Rural Road Projects in Nepal: A Case Study of World Bank Funded Project.

Mishra, A. K. (2019). Status of Collusive Bidding in World Bank Funded Road Projects of Nepal.

Mishra, A. K. (2022). Effect and Remedies of Bidding Trend in Road and Bridge Projects. International Journal of Darshan Institute on Engineering Research and Emerging Technologies, 11(1), 01–07. DOI: https://doi.org/10.32692/IJDI-ERET/11.1.2022.2201

Mishra, A. K., Bhandari, S., and Jha, T. (2018). Factors Affecting Performance and Time Extension of Ongoing Construction Projects Under Town Development Fund, Nepal. Journal Advanced Research in construction and Urban Architecture, 3(4), 7–25. https://doi.org/10.24321/2456.9925.201805 DOI: https://doi.org/10.24321/2456.9925.201805

Mishra, A. K., Sudarsan, J. S., and Nithiyanantham, S. (2021). Assessment of Time–Cost Model of Public Health Buildings in Nepal. Asian Journal of Civil Engineering, 22(1), 13–22. https://doi.org/10.1007/s42107-020-00294-4 DOI: https://doi.org/10.1007/s42107-020-00294-4

Mishra, A. K., and Aithal, P. S. (2020). Financial Impact Assessment of Time Overrun: A Case of Second Small Towns Water Supply And Sanitation Sector Project, Nepal. International Journal of Applied Engineering and Management Letters(IJAEML), 4(2), 159–173. http://doi.org/10.5281/zenodo.4074715

Mishra, A. K., and Aithal, P. S. (2021). Foreign Aid Contribution for the Development of Nepal. International Journal of Management, Technology, and Social Sciences. Technology Publishing, and Social Sciences (IJMTS), 6(1), 162–169. https://doi.org/10.5281/zenodo.470864 DOI: https://doi.org/10.47992/IJMTS.2581.6012.0136

Mishra, A. K., and Aithal, P. S. (2021). Foreign Aid Movements in Nepal. International Journal of Management, Technology, and Social Sciences, 6(1), 142–161. https://doi.org/10.47992/IJMTS.2581.6012.0135 DOI: https://doi.org/10.47992/IJMTS.2581.6012.0135

Mishra, A. K., and Aithal, P. S. (2022). Effectiveness of Arbitration in Construction Projects. International Journal of Management, Technology, and Social Sciences. Technology Publishing, and Social Sciences (IJMTS), 7(1), 96–111. https://doi.org/10.5281/zenodo.6246129 DOI: https://doi.org/10.47992/IJMTS.2581.6012.0180

Mishra, A. K., and Bhandari, S. (2018). Performance Assessment of Ongoing Construction Projects Under Town Development Fund, Nepal. International Journal of Advanced Research in Civil and Structural Engineering, 1(1-2), 27–39.

Mishra, A. K., and Magar, B. R. (2017). Implementability Of Municipal Transport Master Plan of Bandipur Inner Ring Road, Tanahu. Nepal. International Journal of Scientific and Technology Research, 6(8), 306–313.

Mishra, A. K., and Singh, N. K. (2018). A Review on Time and Cost Issues of Infrastructure Projects. Journal of Advanced Research Construction and Urban Architecture, 3(1-2), 32–46. https://doi.org/10.5281/zenodo.7066243 DOI: https://doi.org/10.24321/2456.9925.201807

Niazi, G. A., and Painting, N. (2017). Significant Factors Causing Cost Overruns in the Construction Industry in Afghanistan. Procedia Engineering 7th International Conference On Engineering, Project, and Production Management, Procedia Engineering 182, 182, 510–517. https://doi.org/10.1016/j.proeng.2017.03.145 DOI: https://doi.org/10.1016/j.proeng.2017.03.145

Olawale, Y. A., and Sun, M. (2010). Cost and Time Control of Construction Projects: Inhibiting Factors and Mitigating Measures in Practice. Construction Management and Economics, 28(5), 509–526. https://doi.org/10.1080/01446191003674519 DOI: https://doi.org/10.1080/01446191003674519

Pokhrel, P., Misra, J., Nepal, D. B., and Adhikari, P. (2021). Estimation of Construction Duration for Roads and Bridges In Nepal. Nepal Journal of Civil Engineering, 1(1), 41–49. https://doi.org/10.3126/njce.v1i1.43372 DOI: https://doi.org/10.3126/njce.v1i1.43372

Pyataev, M. (2022). Cost Overruns in Russian Transport Megaprojects. Translator. Under Exclusive License to Springer Nature Switzerland AG 2022. LNNS, 402, 983–991. DOI: https://doi.org/10.1007/978-3-030-96380-4_107

Rekha, P., and Sebastian, L. (2016). Factors Influencing Time Overruns in Construction Projects. International Journal of Scientific and Engineering Research (IJSER), 4(8), 42–44 ISSN (Online) : 2347-3878, Licensed Under Creative Commons Attribution CC BY.

Sharma, M., Mishra, A. K., and Jananiselvam. (2022). Extension of Time in Construction Projects, Management and Economics Journal (MEC-J), 6(2), 157–172. https://doi.org/10.18860/mec-j.v6i2.16659 DOI: https://doi.org/10.18860/mec-j.v6i2.16659

Sharma, M., Mishra, A. K., and Jananiselvam. (2022). Identifying the Possible Measuresto Minimize Material Waste Using Lean Construction. International Journal of Applied Engineering and Management Letters (IJAEML), 6(2), 47–64. https://doi.org/10.5281/zenodo.7016112 DOI: https://doi.org/10.47992/IJAEML.2581.7000.0145

Shrestha, P. P., Burns, L. A., and Shields, D. R. (2013). Magnitude of Construction Cost and Schedule Overruns in Public Work Projects. Journal of Construction Engineering. Hindawi Publishing, 2013. http://doi.org/10.1155/2013/935978 DOI: https://doi.org/10.1155/2013/935978

Statista Research Department. (2022). Size of The Global Construction Market in 2021 With Forecasts From 2021 to 2030.

Steininger, B. I., Groth, M., and Weber, B. L. (2020). Cost Overruns and Delays in Infrastructure Projects: The Case of Stuttgart 21. Journal of Property Investment and Finance, 39(3), 256–282. https://doi.org/10.1108/JPIF-11-2019-0144. DOI: https://doi.org/10.1108/JPIF-11-2019-0144

Stojcetovic, B., Lazarevic, D., Prlincevic, B., Stajcic, D., and Miletic, S. (2014). Project Management : Cost, Time and Quality. 8th International Quality Conference. Center for Quality, Faculty of Engineering, University of Kragujevac.

Susanti, R., and Nurdiana, A. (2020). Cost Overrun in Construction Projects in Indonesia. IOP Conference Series: Earth and Environmental Science, JIC-CEGE 2019, 506(1). https://doi.org/10.1088/1755-1315/506/1/012039 DOI: https://doi.org/10.1088/1755-1315/506/1/012039

Vaghela, H., Nayak, M., Tivadi, G., and Babariya, M. (2021). Causes of Time Overrun in Construction Projects. International Research Journal of Engineering and Technology (IRJET), 8(6), 3079–3083.

Welde, M., and Klakegg, O. J. (2022). Avoiding Cost Overrun Through Stochastic Cost Estimation and External Quality Assurance. IEEE Transactions on Engineering Management, 1–14. https://doi.org/10.1109/TEM.2022.3173175 DOI: https://doi.org/10.1109/TEM.2022.3173175

Yadav, S. K., and Mishra, A. K. (2019). Status of Time and Cost Overrun of Health Building Construction Projects in Nepal. Engineering Technology, 7(9), 262–270.

Downloads

Published

2022-11-30

How to Cite

Sharma, M., Mishra, A. K., & Selvam, J. (2022). REVIEW FOR TIMELY COMPLETION OF INFRASTRUCTURE PROJECTS. International Journal of Research -GRANTHAALAYAH, 10(11), 32–43. https://doi.org/10.29121/granthaalayah.v10.i11.2022.4903