Chauhan, N. (2025). THE ROLE OF EARNED VALUE MANAGEMENT IN DRIVING COST AND SCHEDULE PERFORMANCE IN ENGINEERING PROJECTS. International Journal of Research -GRANTHAALAYAH, 13(5), 210–227. https://doi.org/10.29121/granthaalayah.v13.i5.2025.6214