TY - JOUR AU - Alzahrani, Jaber PY - 2019/01/31 Y2 - 2024/03/29 TI - JOB-SHOP SCHEDULING OPTIMIZATION WITH STOCHASTIC PROCESSING TIMES JF - International Journal of Engineering Technologies and Management Research JA - Int. J. Eng. Tech. Mgmt. Res. VL - 6 IS - 1 SE - Articles DO - 10.29121/ijetmr.v6.i1.2019.347 UR - https://www.granthaalayahpublication.org/ijetmr-ojms/ijetmr/article/view/08_IJETMR19_A01_626 SP - 73-83 AB - <p><strong><em>In this study, a job shop scheduling optimization model under risk has been developed to minimize the make span. This model has been built using Microsoft Excel spreadsheets and solved using @Risk solver. A set of experiments have been also conducted to examine the accuracy of the model and its effectiveness has been proven.</em> </strong></p> ER -