TY - JOUR AU - Laksono, Taufik Dwi AU - Wiyanti, Dwi Sri AU - Atmadi, Pingit Broto PY - 2018/12/31 Y2 - 2024/03/29 TI - PRODUCTIVITY OF CONSTRUCTION PROJECT FROM CONTRACTOR POINT OF VIEW JF - International Journal of Engineering Technologies and Management Research JA - Int. J. Eng. Tech. Mgmt. Res. VL - 5 IS - 12 SE - Articles DO - 10.29121/ijetmr.v5.i12.2018.334 UR - https://www.granthaalayahpublication.org/ijetmr-ojms/ijetmr/article/view/09_IJETMR18_A12_598 SP - 123-133 AB - <p><strong><em>Construction project is a continuous activity that link to one another. If there is a delay in one activity it can make delay to the other activity. One of the factors that affect the project completion time is the productivity of each activity. Research of Contractor point of view on the productivity of construction project is expected to give more actual description of Contractor point of view on work productivity and identifying factors that strongly affect productivity so that it can be used as guidance to take steps to improve productivity in construction project. The method that this research use is questionnaire distribution. This method is chosen because it makes easier for researcher to collect data, saving time, and shorten research time. The research result shows that according to contractor, productivity needs to be increase so that construction project quality also improve. According to contractor poit of view, technology can be used as a solution to increase productivity in construction project.</em> </strong></p> ER -